Author: WJW Aluminum Window Manufacturers
The whole glass curtain wall is a glass curtain wall composed of glass ribs and glass panels.
1. The thickness of the glass of the whole glass curtain wall panel should not be less than 10mm, the thickness of the mezzanine glass should not be less than 8mm, the thickness of the glass curtain wall ribs should not be less than 12mm, and the cross height should not be less than 100mm.
2. When the glass curtain wall exceeds 4m (glass thickness 10, 12mm), 5m (glass thickness 15mm), and 6m (glass thickness 19mm), the whole glass curtain wall should be hung on the main structure.
3. The main component of the whole glass curtain wall should have sufficient stiffness. When the steel truss or steel beam is used as a force component, the heart line is consistent with the center line of the curtain wall. Consistent.
4. The building curtain wall rigid horizontal power structure should be set up between the hanging clip of the full glass curtain wall and the main structure.
5. All steel structures are welded, and concealed engineering acceptance should be performed.
6. The size of the whole glass curtain wall glass panel is generally large, and mechanical suction cups should be installed.
7. The all -glass curtain wall allows injection of silicone structure sealing on the spot.
8. The plate surface of the whole glass shall not be directly contacted with other rigid materials. The gap between the plate surface and the decoration or structure surface shall not be less than 8mm, and a sealing glue should be used.
When designing the backbolic stone curtain wall, the stone decoration must not only meet the requirements of the building facade, but also pay attention to the size and thickness of the stone decorative surface to ensure the intensity requirements of the stone decorative panel under various loads.
1. Craft principle.
The columns of the stone curtain wall are connected to the main structure and the bolt through the embedded parts, and then the horizontal keel of the building curtain wall is welded on the main keel. It transmits stone loads from the outside world to the main keel through Yokoella, so as to pass on the main structure.
2. Process.
Construction preparation Measurement and putting line Hurrying parts Connecting angle code installation column installation waterproof baffle installation beam installation stone assembly component production and installation clean check completion acceptance.
3. The main points of construction operation.
· Measure the line.
1) Measurement basis. Generally, the design of the curtain wall engineering is based on the axis of the building and the internal partition wall of the corresponding civil construction structure. It is necessary to measure the school check -ups.
2) Measurement method, deviation measurement of embedded parts: According to the axis provided by the civil construction structure, the door and window hole control line, and the floor elevation baseline combined with the curtain wall separation size to check the elevation and horizontal deviation of all the embedded parts, and make a record, and then record, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then record it, and then make a record. Organization technical backbone determines the adjustment plan of the column, the curtain wall column axis positioning: determine the column adjustment plan and recognize, determine the axis of the column axis based on the axis provided by the civil construction structure, digested between the axis of this fixed axis. The size of the score is not greater than 2mm.
3) Positioning of the stall of the curtain wall, determine the relationship between the top label height of the single column and the structure of the structure of the structure according to the design requirements, and then use the ink line on the top plate of the structural periphery to pop up the high line or control line of the column.
4) Measurement tools, standards, Jingwei, steel ruler, tower ruler, line falls, ink fights, building curtain walls.