What is the concept of the curtain wall for the curtain wall? In fact, the curtain wall is the suspension wall we call in our daily life. Let's follow the editor to learn about the more comprehensive knowledge about the curtain wall.
First, what is the curtain wall.
1. The curtain wall, it is hung on the outer wall of the building like a curtain. It is not loading, nor does it act as the main structure of the main structure and load. Generally speaking, the curtain wall is relatively light and strong. It is also more beautiful, so for architecture, it has a certain decoration effect.
2. The curtain wall is the outer wall of the building's building curtain wall, which is composed of the panel and support structure system.
Second, the characteristics of the curtain wall.
1. The curtain wall is an independent and complete overall structural system.
2. The curtain wall is usually used on the outside of the main structure, which is generally covered on the surface of the main structure.
3. The curtain wall has a certain micro -movement capacity in the plane.
Third, the performance of the curtain wall.
1. Have strong wind resistance and anti -voltage deformation.
2. It has the characteristics of rainy water leakage.
3. Air permeability.
4. Deformation and shock resistance in the plane).
5. Thermal workers are often referred to.
6, sound insulation and lightning protection.
7, have good architectural curtain wall fire protection, and healthy and environmentally friendly.
8. The appearance is very lost, so it exists as decoration to a certain extent.
9. The curtain wall is also very energy -saving.
Curtain wall glass installation -construction technology.
1. Process.
Sample positioning Installation of support Installed columns Install beams Install glass Play glue Clean up.
2. Put the sample positioning and install the branch.
According to the shape, size and drawing requirements of the curtain wall, the curtain walls, the number of bouncing lines, the number of various buried parts, specifications, location and anticorrosive treatment must meet the design requirements. Set up a fixed support between the curtain wall skeleton and the building structure. The upper and lower branches must be on a vertical line.
3. Install the column.
Between the two fixed branches, the column is fixed with stainless steel bolts according to the installation elevation requirements. The bias deviation of the column installation axis is 2mm. It should be tightened in time.
4 Install the beam.
Determine the elevation of each beam in the column, connect the beam with the column with an aluminum angle, and set the elastic rubber school pad between the contacts of the beam and the column. 35m, m 5mm, when the width of the curtain wall is> 35m, 7mm, the installation of the same layer beam should be carried out from bottom to top, the building curtain wall.